MEPCO Demand Notice Guide 2026: Fee, Payment, Status and Next Steps

MEPCO demand notice is usually issued after verification of a new connection, load extension, name change, or other service request. It explains the payable charges, payment instructions, and next steps required before your application can move forward.

Company: Multan Electric Power Company (MEPCO)
Topic: Demand Notice Payment
Updated: June 2026

In This Guide:

What is MEPCO Demand Notice?

A demand notice is an official payment notice issued by MEPCO after initial approval or verification of an application. It tells the consumer how much amount must be paid for the requested service. Without paying the demand notice, the application usually cannot proceed to the next stage.

Simple Meaning:Demand notice means MEPCO has calculated the charges for your request and you need to pay them before further processing.

When Does MEPCO Issue Demand Notice?

Demand notice may be issued in several MEPCO service cases, especially when technical work, meter installation, security deposit, or load-related cost is involved.

  • New electricity connection application
  • Load extension request
  • Change of name, tariff, or load process
  • Meter replacement or service shifting
  • Connection category change
  • Infrastructure or material-related work

Common Charges Included in Demand Notice

The amount shown in a demand notice depends on the connection type, sanctioned load, distance from existing supply, material required, and current MEPCO rules.

  • Security Deposit: A refundable or adjustable amount collected according to connection category and sanctioned load.
  • Service Connection Charges: Charges related to meter installation, service cable, and connection work.
  • Material Cost: Cost of required material such as wire, meter, pole, transformer support, or other equipment where applicable.
  • Load Extension Cost: Additional cost may apply if demand notice is issued for increasing sanctioned load.

How to Pay MEPCO Demand Notice

After receiving the demand notice, check all details carefully and pay through the payment method or bank mentioned on the document.

Step-by-Step Payment Process
  1. Receive Demand Notice

    After application verification, MEPCO may issue a demand notice containing payable charges and payment instructions.

  2. Check Details Carefully

    Verify applicant name, reference/application number, connection type, sanctioned load, and payable amount.

  3. Pay Before Due Date

    Pay the demand notice through the allowed bank or payment method mentioned on the notice.

  4. Keep Paid Receipt

    Keep the original paid receipt and make photocopies for office submission and future record.

  5. Submit Proof if Required

    Some cases may require submitting paid proof to the concerned MEPCO subdivision office.

Important Tips After Demand Notice Payment

After payment, keep your documents safe and follow up with the concerned office to avoid delay in installation or approval.

Do Not Delay Payment

Demand notice may expire or require revalidation if not paid within the given time.

Match Applicant Details

Check that your name, CNIC, application number, and connection category are correct before payment.

Keep All Copies

Keep scanned and photocopied versions of the notice, paid receipt, application form, and CNIC.

Follow Up Regularly

After payment, follow up with the relevant office for meter installation, load extension, or connection approval.

Note:Demand notice charges can vary according to connection type, sanctioned load, material requirement, security deposit, and current MEPCO rules. Always verify the final amount from the official notice.